Friday 18 November 2011

Progress 4th assessment piece

IMAGE 1 WORKING ON THE BACK PANEL
IMAGE 2 THE BACK PANEL INSET INTO THE BACK FABRIC TOGETHER WITH THE EDGED FRONTSIMAGE 3 WORKING ON THE SLEEVES
IMAGE 4 CUTTING OUT THE BIRDS
IMAGE 5 THE PLACEMENT OF THE BIRDS.The on the right of picture front (actual left front) are placed under the net and will be fastened down flat on to the base fabric. The birds on the left of picture front (actual right front) will be placed on top of the net and caugh down at the wing tips, beak and tails to give a curved effect so that they stand proud of the background.

No comments:

Post a Comment